LB

Draft Terms of Reference for ICC Arbitration — Solar EPC Subcontract Dispute

ArbitrationICC arbitrationterms of referenceEPC contractsenergy disputesinternational commercial arbitrationconstruction disputesrenewable energy

Instructions

Draft the Terms of Reference for the attached ICC arbitration under Article 23 of the 2021 Rules, bracketing disputed text for tribunal resolution. Output: `terms-of-reference.docx`.

Work type: Draft — Produce a legal document such as a contract, motion, or client letter.

Deliverables (1)

  • terms-of-reference.docx

Reference documents (7)

  • DOCX
    answer-and-counterclaim.docx
    58.2 KB
    Open
  • EML
    arbitrator-directions.eml
    7.6 KB
  • DOCX
    claimant-draft-tor.docx
    52.5 KB
    Open
  • DOCX
    cmc-minutes.docx
    50.0 KB
    Open
  • DOCX
    epc-subcontract-excerpts.docx
    65.1 KB
    Open
  • DOCX
    request-for-arbitration.docx
    57.4 KB
    Open
  • DOCX
    respondent-draft-tor.docx
    56.0 KB
    Open

Preview renders .docx and .pdf in-page via SuperDoc; bytes are fetched on demand from the pinned upstream harvey-labs commit. Open takes you to GitHub for any file type.

Rubric (80)

Each criterion is judged independently as pass or fail. The task scores 1.0 only if every criterion passes.

80 of 80 criteria